Commercial and Industrial

Power Distribution That Keeps Pace with the Building

Office towers, hospitals, manufacturing plants, and warehouses all have different operating needs. The power distribution plan needs to work with the available space, the equipment, and how the facility may change over time. LS Busway can be used in new construction, expansions, and upgrades.

C&I

Facility Power Distribution

Commercial and industrial facilities need power distribution systems that can support heavy loads, changing layouts, and demanding operating conditions. LS Busway systems help simplify electrical distribution for manufacturing lines, processing areas, warehouses, production spaces, and large commercial facilities.

With modular routing and tap-off options, busway can help reduce complex cable runs and support future changes as equipment and facility needs evolve.

USMA_052126

The Challenge

Why Commercial and Industrial Power Distribution Demands More

Commercial and industrial projects vary by facility. Available space, installation schedules, future power needs, and code requirements all affect the power distribution plan.
Riser Shaft Space Constraints
In high-rise commercial towers, electrical riser shafts compete for square footage with plumbing, HVAC, and telecom. Busway's compact cross-section can reduce shaft space requirements compared to equivalent cable-and-conduit installations.
Changing Tenant Loads
Office buildings, mixed-use towers, and campus facilities see tenant turnover and load changes over their lifespan. The distribution system needs to accommodate adds, moves, and changes without ripping out infrastructure.
Harsh Operating Environments
Manufacturing floors, food processing plants, and outdoor industrial settings expose electrical infrastructure to high ambient temperatures, vibration, moisture, and corrosive atmospheres. Derating and enclosure ratings become critical design factors. 
Code and Project Requirements
Facility type, location, equipment, and local code requirements affect the power distribution plan. Project-specific requirements should be reviewed with the design team and authority having jurisdiction.
Why Busway

Why Commercial and Industrial Teams Choose Busway Over Cable-and-Conduit

Commercial and industrial facilities face changing loads, evolving layouts, space constraints, and demanding operating conditions. Power-distribution decisions affect installation, future modifications, and long-term serviceability.
Flexible Power Routing
Busway helps organize power distribution through compact, modular pathways that can be adapted to the layout of the facility.
Support for Changing Equipment Needs
Tap-off options can help support future changes to production lines, equipment placement, or electrical loads.
Reduced Installation Complexity
Compared to traditional cable and conduit layouts, busway can help simplify routing and reduce field coordination challenges.
Recommended Products

Commercial and Industrial Product Lineup

Project Showcase

Commercial & Industrial Installations

Real-world C&I projects featuring LS Busway systems — offices, mixed-use, and manufacturing.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Project title
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Project title
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.

Certifications and Compliance

Certification and compliance documentation may vary by product, configuration, and project requirements. Please contact LS Busway to request the applicable documentation for your project.
Standards & Compliance

Certifications That Matter for Commercial & Industrial

Star
UL 857
Busway — safety standard for busway and associated fittings rated 600V or less
Base requirement for all LS Busway products in US installations
Star
UL 891
Switchboards — covers Data-Way tap-off box assemblies with integrated circuit protection
Required for plug-in units with built-in breakers in rack distribution
Star
UL 857
Busway — safety standard for busway and associated fittings rated 600V or less
Governs busway installation requirements that AHJs enforce on every data center project

Technical Documents

Product documentation is available upon request. Contact LS Busway for the latest product literature, technical data, and project-specific documentation.
Downloads

Commercial & Industrial Resources

PDF
Ex-Way Datasheet

Rev. 7 · Jan 2026 · 2.1 MB

PDF
Ex-Way Installation Manual

Rev. 7 · 7.8 MB

PDF
UL 857 Test Certificate

Cert E###### · 480 KB

PDF
Data-Way Product Datasheet

Rev. 1 · 2026

PDF
Data-Way Flyer / Brochure

Introducing Data-Way · 2 pages

PDF
Data-Way (UL) Datasheet

Rev. 4 · Mar 2026 · 1.8 MB

PDF
NSPB LV/MV Datasheet

Available upon request.

PDF
Bus Plugs Datasheet

Available upon request.

PDF
NSPB LV/MV IEEE C37.23 Type Test Documentation

Type-tested with UL witnessing. Not a UL Listing. Available upon request.

PDF
IEEE 693 Seismic Test Report

2.8 MB


Explore More

Other Applications

Commercial_and_Industrial
Commercial and Industrial
Catalog, Flyer, Brochures.
Data Centers
Data Centers
 Datasheets, CAD files, Standards Matrix 
Renewable
Renewable
Videos, guides, Webinars
Residential_thumb
Residential
Videos, guides, Webinars
Battery
Battery
Videos, guides, Webinars

Ready to Discuss Your Commercial and Industrial Project?

Our application engineers can help with commercial and industrial power distribution, including product recommendations, layout reviews, and specification support.