Power Distribution That Keeps Pace with the Building
Office towers, hospitals, manufacturing plants, and warehouses all have different operating needs. The power distribution plan needs to work with the available space, the equipment, and how the facility may change over time. LS Busway can be used in new construction, expansions, and upgrades.
Facility Power Distribution
Commercial and industrial facilities need power distribution systems that can support heavy loads, changing layouts, and demanding operating conditions. LS Busway systems help simplify electrical distribution for manufacturing lines, processing areas, warehouses, production spaces, and large commercial facilities.
With modular routing and tap-off options, busway can help reduce complex cable runs and support future changes as equipment and facility needs evolve.
Why Commercial and Industrial Power Distribution Demands More
Riser Shaft Space Constraints
In high-rise commercial towers, electrical riser shafts compete for square footage with plumbing, HVAC, and telecom. Busway's compact cross-section can reduce shaft space requirements compared to equivalent cable-and-conduit installations.Changing Tenant Loads
Office buildings, mixed-use towers, and campus facilities see tenant turnover and load changes over their lifespan. The distribution system needs to accommodate adds, moves, and changes without ripping out infrastructure.Harsh Operating Environments
Manufacturing floors, food processing plants, and outdoor industrial settings expose electrical infrastructure to high ambient temperatures, vibration, moisture, and corrosive atmospheres. Derating and enclosure ratings become critical design factors.Code and Project Requirements
Facility type, location, equipment, and local code requirements affect the power distribution plan. Project-specific requirements should be reviewed with the design team and authority having jurisdiction.Why Commercial and Industrial Teams Choose Busway Over Cable-and-Conduit
Flexible Power Routing
Busway helps organize power distribution through compact, modular pathways that can be adapted to the layout of the facility.Support for Changing Equipment Needs
Tap-off options can help support future changes to production lines, equipment placement, or electrical loads.Reduced Installation Complexity
Compared to traditional cable and conduit layouts, busway can help simplify routing and reduce field coordination challenges.Commercial and Industrial Product Lineup
EX-Way
Low Voltage Busway
| ≤ 600V AC | 630–6000A | 150kA | NEMA 1 / 3R | Cu / Al | UL 857 |
| Voltage | Current | SCCR | IP | Conductor | Standard |
- Totally enclosed sandwich design
- Copper or aluminum conductors
- NEMA 3 weather-resistant
NSPB
Low and Medium Voltage Busway
| 1.058 / 4.76 / 15 / 27 kV | 1,250-5,000 A | 40 or 65 kA / 2 s | NEMA 250 Type 3R | Copper | IEEE C37.23 |
| Voltage | Current | SCCR | Enclosure | Conductor | Testing |
- Low and medium-voltage configurations
- Medium-voltage configurations up to 27 kV
- Tested in accordance with IEEE C37.23
- NEMA 250 Type 3R (outdoor) enclosure available.
- Compact, space-efficient design
Bus Plug
30–1200 A · MCCB / Fusible
| 30–1200A | MCCB / Fusible |
| Range | Type |
- 30–1200A
- MCCB or fusible configurations
Commercial & Industrial Installations
Real-world C&I projects featuring LS Busway systems — offices, mixed-use, and manufacturing.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Project title
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Project title
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.Certifications and Compliance
Certifications That Matter for Commercial & Industrial
UL 857
Busway — safety standard for busway and associated fittings rated 600V or less
UL 891
Switchboards — covers Data-Way tap-off box assemblies with integrated circuit protection
UL 857
Busway — safety standard for busway and associated fittings rated 600V or lessTechnical Documents
Commercial & Industrial Resources
NSPB LV/MV Datasheet
Available upon request.
Bus Plugs Datasheet
Available upon request.
NSPB LV/MV IEEE C37.23 Type Test Documentation
Type-tested with UL witnessing. Not a UL Listing. Available upon request.
Other Applications
Ready to Discuss Your Commercial and Industrial Project?
Our application engineers can help with commercial and industrial power distribution, including product recommendations, layout reviews, and specification support.