Commercial & Industrial

Power Distribution That Keeps Pace with the Building

From high-rise office towers and hospital campuses to manufacturing floors and warehouse complexes — commercial and industrial facilities need power distribution that installs fast, adapts to changing tenant loads, and performs in demanding environments. LS Busway delivers feeder and riser solutions engineered for the full range of C&I applications.

C&I

Facility Power Distribution

Commercial and industrial facilities need power distribution systems that can support heavy loads, changing layouts, and demanding operating conditions. LS Busway systems help simplify electrical distribution for manufacturing lines, processing areas, warehouses, production spaces, and large commercial facilities.

With modular routing and tap-off options, busway can help reduce complex cable runs and support future changes as equipment and facility needs evolve.

USMA_052126

The Challenge

Why Commercial and Industrial Power Distribution Demands More

 C&I projects span dozens of building types, but the electrical challenges share common themes — space, speed, flexibility, and code compliance.
Riser Shaft Space Constraints
In high-rise commercial towers, electrical riser shafts compete for square footage with plumbing, HVAC, and telecom. Busway's compact cross-section can reduce shaft space requirements compared to equivalent cable-and-conduit installations.
Changing Tenant Loads
Office buildings, mixed-use towers, and campus facilities see tenant turnover and load changes over their lifespan. The distribution system needs to accommodate adds, moves, and changes without ripping out infrastructure.
Harsh Operating Environments
Manufacturing floors, food processing plants, and outdoor industrial settings expose electrical infrastructure to high ambient temperatures, vibration, moisture, and corrosive atmospheres. Derating and enclosure ratings become critical design factors. 
Seismic and Code Compliance
Hospitals, government buildings, and essential facilities in seismic zones require power distribution systems that meet IEEE 693 seismic qualification and local building codes. AHJ approvals add complexity to every specification.
Why Busway

Why Commercial and Industrial Teams Choose Busway Over Cable-and-Conduit

Data center teams face constraints that traditional commercial projects don't — every design decision affects uptime, scalability, and operating cost at scale. 
Flexible Power Routing
 Busway helps organize power distribution through compact, modular pathways that can be adapted to the layout of the facility. 
Support for Changing Equipment Needs
 Tap-off options can help support future changes to production lines, equipment placement, or electrical loads. 
Reduced Installation Complexity
 Compared to traditional cable and conduit layouts, busway can help simplify routing and reduce field coordination challenges. 
Recommended Products

Commercial and Industrial Product Lineup

Project Showcase

Commercial & Industrial Installations

Real-world C&I projects featuring LS Busway systems — offices, mixed-use, and manufacturing.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Project title
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Project title
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.
Case study: supporting a fast-moving data center build
A US data center project required MV power cable that could keep pace with a compressed construction schedule and complex routing conditions. The project team needed confidence that the specified cable would perform consistently once installed, while documentation and coordination stayed aligned as project details evolved.

Certifications & Compliance

Certification and compliance documentation may vary by product, configuration, and project requirements. Please contact LS Busway to request the applicable documentation for your project.
Standards & Compliance

Certifications That Matter for Commercial & Industrial

Star
UL 857
Busway — safety standard for busway and associated fittings rated 600V or less
Base requirement for all LS Busway products in US installations
Star
UL 891
Switchboards — covers Data-Way tap-off box assemblies with integrated circuit protection
Required for plug-in units with built-in breakers in rack distribution
Star
UL 857
Busway — safety standard for busway and associated fittings rated 600V or less
Governs busway installation requirements that AHJs enforce on every data center project

Technical Documents

Product documentation is available upon request. Contact LS Busway for the latest product literature, technical data, and project-specific documentation.
Downloads

Commercial & Industrial Resources

PDF
Ex-Way Datasheet

Rev. 7 · Jan 2026 · 2.1 MB

PDF
Ex-Way Installation Manual

Rev. 7 · 7.8 MB

PDF
UL 857 Test Certificate

Cert E###### · 480 KB

PDF
Data-Way Product Datasheet

Rev. 1 · 2026

PDF
Data-Way Flyer / Brochure

Introducing Data-Way · 2 pages

PDF
Data-Way (UL) Datasheet

Rev. 4 · Mar 2026 · 1.8 MB

PDF
NSPB MV Datasheet

Rev. 3 · Feb 2026 · 2.4 MB

PDF
Bus Plugs Datasheet

Rev. 2 · Dec 2025 · 1.2 MB

PDF
IEC 61439-6 Type Test Report — NSPB MV

1.2 MB

PDF
IEEE 693 Seismic Test Report

2.8 MB


Explore More

Other Applications

Commercial_and_Industrial
Commercial & Industrial
Catalog, Flyer, Brochures.
Data Centers
Data Centers
 Datasheets, CAD files, Standards Matrix 
Renewable
Renewable
Videos, guides, Webinars
Residential_thumb
Residential
Videos, guides, Webinars
Battery
Battery
Videos, guides, Webinars

Ready to Discuss Your Data Center Project?

Our application engineers specialize in data center power distribution. Get product recommendations, layout reviews, and specification support.